Link the Task, the File and the Project Before the Review Meeting
Prepare a project review by connecting each open task to the relevant file and decision, then checking what participating colleagues can open.

The task says “check drawing.” The drawing sits in a folder. The meeting invitation names the project. The reviewer still has to work out which drawing belongs to which unfinished decision.
Give each review item a concrete question
Imagine an installation coordinator preparing a project review. One task concerns a changed entrance layout. Replace the vague review instruction with a question: “Does this drawing reflect the agreed entrance width?” This illustrative example shows the level of specificity to aim for; it does not establish a technical approval rule for an actual installation.
Connect supporting material through the project
EGroupware’s ProjectManager documentation describes linking attachments from file management or email to a project and associating project work with tasks. Use the relevant native relationships to bring the supporting material into the project context. Check that the file being linked is the one intended for this review. A link establishes a relationship; it does not certify the drawing as approved.
Check access before the discussion
Ask a participating colleague to open the task and then reach the supporting file through the intended route. Their permissions may differ from the coordinator’s. Use this check to identify configuration questions while there is time to resolve them. For an external participant, decide separately whether the project workspace or a bounded file exchange is the appropriate route.
Record the decision beside the work
During the review, distinguish the observation, the decision and the next action. If a revised file is required, name the responsible person and how the next review will identify the revision. Keep the task’s completion rule tied to the actual project decision. The goal is a review that can point to its working material, not a collection of links that leaves approval and responsibility implicit.
Evaluate the hosted package in context
See the EGroupware guidance for this team situation and the eCloud product overview. The checked base offer includes two concurrent users and 20 GB. Synchronising users consume concurrent access; optional services and extra capacity require separate selection.
Check the current EGroupware eCloud offer. Affiliate disclosure: we may earn a commission if you purchase through this link.
Continue with Reuse a Project Structure Without Reusing Last Month’s Assumptions for a related decision.
Sources and scope
This guidance uses public vendor documentation checked on 18 November 2026. It is not a hands-on review of a configured customer installation.